“Exchange for Change”, the organization delivering the UK’s Deposit Return Scheme (DRS), has opened the first phase of registration for producers and retailer return points. The registration portal went live on 29 September 2026, just over a year ahead of the scheme’s planned launch in October 2027.
TABLE OF CONTENTS
Businesses required to register as a producer, a return point operator, or both, can now create an account and complete Phase 1 through the Exchange for Change registration portal. The first phase collects core business information, including company and trading details, primary contacts and relevant addresses, and should be completed as soon as possible.
Once Phase 1 is submitted, businesses receive a registration reference number. Registration is not complete at this stage, however. Phase 2 opens in January 2027 and will require producers and retailers to submit additional information specific to their responsibilities under the DRS.
Who Needs to Register
Registration applies to producers and return point operators or businesses that are both. According to Exchange for Change, most supermarkets, grocery stores and convenience stores will act as return point operators.
Retailers in urban areas with a retail space under 100 m² are automatically exempt from operating a return point and do not need to register unless they choose to offer one. Urban retailers between 100 m² and 199 m² and rural retailers under 200 m² will be able to apply for an exemption, but they must still complete the registration process. Further details on how to apply will be published in the coming months.

Fees and Operational Progress
The registration opening follows a series of operational announcements in recent months. Exchange for Change confirmed a flat 20p deposit in April 2026, as we covered in a previous article. The Return Handling Fee, the payment to businesses that handle returned containers, was set in June alongside £60 million in grants to help small retailers install reverse vending machines. In September, producer fees were set at zero for the first 15 months of the scheme’s operation. Exchange for Change also announced new recycling infrastructure for the system.
Transition Arrangements for Existing Stock
Exchange for Change has also published initial transition arrangements for England, Northern Ireland and Scotland. Containers filled before 1 October 2027 fall outside the scheme and can continue to be sold after launch. Unfilled packaging ordered before that date may also be filled and sold, subject to ongoing discussions with regulators. Any other packaging placed on the market after launch must carry both the deposit logo and a scheme-registered barcode. Exchange for Change encourages businesses to sell through pre-launch stock by April 2028, although this is not a regulatory requirement. Arrangements for Wales will be published separately.
Conclusion
Phase 1 is a simple first step, requiring only basic company information, but it is a prerequisite for the more detailed Phase 2 in January 2027. Producers and retailers that have not yet assessed whether they fall within the scope of the DRS should do so now, using the supporting documentation available at exchangeforchange.co.uk.









